BHP BILLITON IRON ORE PTY LTD

2012-11-22 · Crushing facilities Primary and secondary crushers located at Mt Whaleback mine and Tertiary crusher and screening plant located at Nelson Point port. Lump re -screening plant also located at Nelson Point port Railway? Yes Railway destination Nelson Point, Port Hedland Railway distance (km) 426km Mt Newman

Major Mines & Projects | Mt Newman (Mt Whaleback, Eastern ...

The Mt Whaleback beneficiation plant treats contact ores using heavy medium (ferrosilicon) drum, cyclone and spirals circuits. [2006, CP, p. 35,36,37] Orebody 25 Ore processing plant: primary and secondary crushing and screening plant (nominal capacity 12 Mtpa).

review of Operations Iron ire Beneficiation Plant

Review of Operations Iron Ore Beneficiation Plant 33 Figure 1. Generalized Cross-Section Looking West through Mt . Whaleback The Beneficiation Plant was designed …

Fire damages Whaleback plant | The West Australian

2015-12-7 · Fire has caused damage to a beneficiation plant at BHP Billiton''s Mt Whaleback mine this morning. The blaze started at around 12.30am believed to be as a result of welding activity undertaken on a dry screen shoot hatch, during shutdown work. A BHP spokeswoman said no one was injured in the incident and there would be no impact on production.

steel fabrication Archives

2020-7-17 · The assembly of the 12 Mt/y plant will be completed on site at BHP''s Mt Whaleback mine, replacing the existing CSI crushing plant at the iron ore operation. This …

Q3 KEY POINTS

2021-4-15 · • During the quarter, MRL commissioned three crushing plants, including a NextGen 2 plant at Mount Whaleback, the Wonmunna plant and another at a third-party site. The combined capacity of these plants is 31mtpa. • In March 2021, MRL was awarded two highly prospective gas exploration permits in the Perth and Northern Carnarvon Basins.

MinRes haulage disruptions impact iron ore shipments ...

2021-4-16 · The March 2021 quarter also saw MinRes commission three crushing plants at Mount Whaleback, Wonmunna and another at a third-party site, which produce a 31-million-tonnes-per-year combined capacity.

For personal use only

2012-11-22 · Whaleback Crushing Plant Yarrie Whaleback plant . For personal use only Crushing/Screening Plant, CSI Crushing Capacity • CSI has a world renowned reputation with a proven ability to design, construct and operate client focussed crushing, screening and processing solutions

Chairman''s Address 2012 Annual General Meeting

2019-5-27 · Crushing Plant Yarrie Whaleback plant . Crushing/Screening Plant, CSI Crushing Capacity • CSI has a world renowned reputation with a proven ability to design, construct and operate client focussed crushing, screening and processing solutions

crusher Archives

2021-8-15 · Weir Minerals process-focused solution lifts CNC output. CNC Crushers raised throughput at the Roadstone Shaft 5 crushing plant in South Africa by 45 …

Heritage Council of WA

BHP Iron Ore directly employs about 2,400 people at Newman, Port Hedland and its head office in Perth. Today (1997) visitors can participate in a mine tour and can visit the site of the Mt Whaleback mining operation. Here the terraced orebody continues to be excavated and put through crushing plants …

•Delivered a second low cost mobile crushing and screen plant for Mount Whaleback within 8 months. This project lowered the operating cost of Mount Whaleback by AUD$36 Million per year, and eliminated the need of double handling of ore, and reduced surface mobile equipment within the mine through the reduction of 11 haul trucks requirement within the fleet.

K.N. SANATHKUMARA

SG Controls Private Limited. Nov 2011 - Sep 201211 months. 4, Uppill Place, Wangara, WA 6065. Sub-contracting to CSI for KBT2, CARINA & Phil''s Creek Iron Ore process plant design, construction and commissioning. • Programming, testing and commissioning of Allen Bradley and GE Fanuc PLC systems for crushing plant and iron ore stock yard.

mt whaleback beneficiation plant

The Mt Whaleback beneficiation plant treats contact ores using heavy medium (ferrosilicon) drum, cyclone and spirals circuits. [2006, CP, p. 35,36,37] Orebody 25 Ore processing plant: primary and secondary crushing and screening plant (nominal capacity 12

Mineral Resources (ASX:MIN) share price sinks on ...

2021-4-16 · Mineral Resources also commissioned 3 crushing plants – a NextGen 2 plant at Mount Whaleback, the Womunna plant and another at a third-party site. …

CSI crushes it

2020-6-29 · CSI crushes it. MINERAL Resources-subsidiary CSI Mining Services is to design, build and operate a NextGen crushing plant at the Mt Whaleback iron ore mine in Western Australia''s Pilbara as part of a five-year crushing and screening contract with BHP. The NextGen plant, a joint development of CSI and Minerals, replaces the existing CSI ...

Malcolm Spragg

Reviewing, rationalising and rewriting the plant isolation lists and procedures for the iron ore processing plants at Whaleback: OHP2 High Grade (Primary and Secondary Crushing) OHP4 Hub (Car Dumper, Coarse Ore Stockpile, Scalping & Product Screening, Oversize Crushing, Plant Conveyors, Sample Stations, Stockyard, Stockyard Machines and Train ...

CSI Mining Services wins a five-year crushing and ...

2020-6-29 · The contract award includes the supply, construction, installation and operation of CSI''s NextGen crushing plant, which will replace the existing CSI crushing plant at Mt Whaleback. This new scope builds on a 13-year working relationship with BHP and allows CSI to extend its history of safe and successful operations on the site since 2012.

Joshua Dawson

Design, procure/supply, construct and operate 1 off 5MTPA relocatable crushing plant at Mt Whaleback mine. The contracts were separated between the two mines. Jimblebar contract duration was 3.5 ...

Newman Operations – Whaleback Hub OHP5 Relocatable …

2019-10-18 · 10 metres (m) to the west of the existing Whaleback 7 mtpa relocatable crusher (Ore Handling Plant 5 [OHP5]). The 7 mtpa relocatable crusher will then be decommissioned following successful commissioning of the Project. (Attachment 2B). This supporting document has been prepared to provide supplementary information to the

Tsz Chun Stephen Chan

•Delivered a new low cost mobile crushing and screen processing plant within 6 months, capable of 5Mtpa within the brown field site of BHP Billiton Mt Whaleback operations, and ramped up facilities to assist Mount Whaleback to achieve 58Mtpa production for FY13. The project was delivered on-time, within budget without safety injuries.

LONGEVITY IN ENGINEERING TECHNOLOGY

2021-5-26 · Project: Crushing Plant Commissioning Site: Mt. Whaleback Client: BHP Billiton Iron Ore Position: Infrastructure Specialist Project: Desktop Builds Site: Operations Centre Client: Rio Tinto Position: Mining Systems Specialist Project: Autonomous Haulage Systems Site: Operations Centre Client: Rio Tinto Position: PCS Client Representative

Lee Wood

I worked as part of the Next Gen 2 team for the construction and installation of the mobile crushing plant to be located at Whaleback area 10, and in house projects for various …

Completed Projects – Mobecrete & Construction Pty Ltd

We have mobilised a mobile batch plant and fleet of agi trucks. Works commenced in July 2015 and are expected to be completed by September 2015. ... Mt Whaleback and Yarrie In 2012 Mobecrete became a preferred contractor for the provision of detailed civil earthworks and concrete supply and installation with Crushing Services International. We ...

BHP contracts MinRes at Mt Whaleback for five years ...

2020-6-29 · BHP has awarded Mineral Resources (MinRes) subsidiary CSI Mining Services a contract to deliver a crushing plant at the Mt Whaleback iron ore mine in Western Australia. The five-year contract involves the design, construction and operation of the latest NextGen crushing plant, which will replace the existing plant at Mt Whaleback.

Company News Summary

2021-4-16 · Mining Services production volumes for the quarter was consistent with the (Q3 FY 2020) pcp and in-line with expectations. During the quarter, the Company commissioned three crushing plants, including a NextGen 2 plant at Mount Whaleback, the Wonmunna plant and another at a third-party site. The combined capacity of these plants is 31mtpa.

CSI secures contract to build crushing plant at BHP''s Mt ...

2021-2-24 · Base Metals CSI NextGen II Modular Crushing Plant Starts up at BHP Mt Whaleback. Mineral Resources Ltd''s CSI Mining Services team has reached a major milestone with the NextGen II modular crushing plant having now crushed its first ore at the BHP-owned Mt Whaleback iron ore mine in the Pilbara of Western Australia.

NextGen Modular Crushing Plant

2021-8-2 · Our first modular crushing plant was successfully installed in 2018 at Pilbara Minerals'' Pilgangoora site in the Pilbara. During the 2021 financial year Mineral Resources commissioned three crushing plants, including a plant at the Wonmunna Iron Ore project and a NextGen 2 plant at Mt Whaleback.

Blue Lifeline WA NextGen 2 spreads mental health awareness ...

2020-9-24 · Our NextGen 2 crushing plant has continued to spread Lifeline WA''s message of mental health across the state''s outback as it passed through Newman on the way to its final destination at Mt Whaleback. The new machinery, painted in Lifeline WA''s trademark blue and displaying the 13 11 14 crisis support number, is a symbol of MRL''s new ...

Licence

Iron ore at Mt Whaleback is mined by conventional open cut methods. The ore is drilled and blasted and then loaded onto haul trucks and processed using primary and secondary crushers. The ore is then conveyed to the Newman Hub which includes a car dumper, reclaiming facilities stockyards and a crushing and screening plant.

Blasting in iron ore mines

Blasting in iron ore mines Products. As a leading global manufacturer of crushing, grinding and mining equipments, we offer advanced, reasonable solutions for any size-reduction requirements including, Blasting in iron ore mines, quarry, aggregate, and different kinds of minerals.

Yandi / Area C / OB23-24-25 / Mt Whaleback | SMS Mining ...

Yandi / Area C / OB23-24-25 / Mt Whaleback. START DATE / END DATE. 2009-2017. LOCATION. Newman, WA. COMMODITY. Iron Ore. SCOPE OF WORKS. Equipment Hire. PLANT & EQUIPMENT. Up to 50 pieces of earthmoving equipment

CSI and ''s NextGen crushing plant to go to BHP Mt ...

2020-6-29 · CSI Mining Services (CSI), a wholly-owned subsidiary of Mineral Resources Limited, has been awarded a milestone contract to design, construct and operate the latest "NextGen" crushing plant at BHP''s Mt Whaleback iron ore mining operation in Western Australia''s Pilbara region.

Mining Crusher-NextGen 2 has arrived!

2020-7-17 · Mining Crusher-NextGen 2 has arrived! In January 2020, the MRL and Minerals Joint Venture awarded a ground-breaking world-class fabrication contract to three separate fabrication companies in Turkey. Birikim and Mass Makina, located in the Capital of Ankura and Bilim Makina, located in the coastal location of Bursa, approximately 100km ...

Copyright © 2007- AMC | Sitemap